LEON & 5TH IS OPEN!
WORK CREWS HAVE REPAIRED THE PIPE AND INSTALLED THE TEMPORARY PATCH AT THE COLLAPSE SITE AT THE INTERSECTION OF FIFTH STREET AND LEON AVENUE.
![](https://www.delrantownship.org/wp-content/uploads/2024/01/20240124_152506-1024x724.jpg)
The base course of the road. The top coat of paving will be installed when the weather breaks in the Spring.