WORK CREWS HAVE REPAIRED THE PIPE AND INSTALLED THE TEMPORARY PATCH AT THE COLLAPSE SITE AT THE INTERSECTION OF FIFTH STREET AND LEON AVENUE.
The base course of the road. The top coat of paving will be installed when the weather breaks in the Spring.